-
×
Sports Harness Camo L
£20.50 -
×
60" Rope Slip Brown
£7.50 -
×
-
×
-
×
Trigger Rope Lead Purple
£7.50 -
×
Trigger Rope Lead Black
£7.50 -
×
60" Thin Rope Slip Black
£6.75 -
×
-
×
-
×
60" Rope Slip Pink
£7.50 -
×
Harness Medium Red
£7.00 -
×
-
×
-
×
-
×
-
×
-
×
Harness X Small Orange
£7.00 -
×
Fox Large
£5.50
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm