-
×
-
×
Trigger Rope Lead Black
£7.50 -
×
-
×
Bird Cat Toy 13cm Mixed
£1.50 -
×
-
×
Aqua Medium
£13.00 -
×
-
×
-
×
-
×
-
×
-
×
-
×
Red Lead 5/8" X 48"
£7.50 -
×
-
×
-
×
Sports Harness Bright Pink L
£20.50 -
×
-
×
-
×
Sports Harness X Small Red
£13.50 -
×
Sports Harness X Small Blue
£12.50 -
×
-
×
SUPER Mega Ball
£9.00 -
×
60" Thin Rope Slip Pink
£6.75 -
×
Duck Large
£6.00 -
×
-
×
3/4" Lead Medium
£5.50 -
×
1/2" Collar Small
£3.50 -
×
"super" Mega Ball Orange
£4.50 -
×
-
×
-
×
-
×
-
×
Fox Large
£5.50 -
×
Absorbent Solid Grey 10m X 75cm
£140.00 -
×
Rock With Dinosaurs
£5.00 -
×
Trigger Rope Lead Brown
£7.50 -
×
Lead 3/4" X 48" Medium
£4.50 -
×
-
×
60" Rope Slip Purple
£7.50 -
×
-
×
-
×
-
×
-
×
-
×
Fish Cat Toy 18cm Mixed
£1.50 -
×
Harness X Small Blue
£7.00 -
×
-
×
-
×
-
×
Squirrel Country Dog Toy
£12.00 -
×
Harness Medium Red
£7.00 -
×
Harness X Small Purple
£7.00 -
×
Sports Harness Camo S
£15.00 -
×
-
×
Sports Harness X Large Blue
£22.00 -
×
“TPR Holey Ball Dog Toy with Elasticated Bungee Handle” has been added to your cart. View cart
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm