-
×
-
×
Fox Large
£5.50 -
×
-
×
-
×
-
×
-
×
Harness X Small Black
£7.00 -
×
-
×
-
×
Mountain Slip Lead Black
£7.50 -
×
60" Rope Slip Grey
£7.50 -
×
-
×
Pick Me Up Welsh Rugby Ball
£10.00 -
×
-
×
Crazy Crocodile
£4.00 -
×
-
×
-
×
-
×
-
×
-
×
-
×
60" Rope Slip Black
£7.50 -
×
-
×
Dog Training Clicker
£2.00 -
×
Fox Country Dog Toy
£11.00 -
×
Pheasant Country Dog Toy
£12.00 -
×
60" Rope Slip Brown
£7.50 -
×
Sports Harness Camo L
£20.50 -
×
Duck Country Dog Toy
£12.00 -
×
Trigger Rope Lead Purple
£7.50 -
×
Harness X Small Purple
£7.00
“Duck Country Dog Toy” has been added to your cart. View cart
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm