-
×
Purple Large
£14.50 -
×
Harness X Small Purple
£7.00 -
×
60" Thin Rope Slip Grey
£6.75 -
×
-
×
-
×
-
×
Harness Medium Black
£7.00 -
×
-
×
60" Rope Slip Purple
£7.50 -
×
Trigger Rope Lead Purple
£7.50 -
×
Sports Harness Medium Orange
£16.50 -
×
-
×
Rat Small
£4.50 -
×
Bird Cat Toy 13cm Mixed
£1.50 -
×
-
×
-
×
-
×
60" Thin Rope Slip Pink
£6.75 -
×
Flashing Pet Collar
£10.00 -
×
Trigger Rope Lead Brown
£7.50 -
×
Trigger Rope Lead Black
£7.50 -
×
-
×
-
×
60" Rope Slip Brown
£7.50 -
×
-
×
-
×
-
×
-
×
Tpr Cone Toy Medium
£3.00 -
×
Harness X- Small Red
£6.00 -
×
Sports Harness Medium Blue
£16.50 -
×
Sports Harness Camo L
£20.50 -
×
-
×
Squirrel Country Dog Toy
£12.00
“Squirrel Country Dog Toy” has been added to your cart. View cart
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm
Bestsellers
Categories: Collars and Leads|Dog, Dogs, Flashing Range|Dog, Nylon/Rope/Tougher Toys|Dog, Toys, Toys
Flashing Pet Collar
£10.00SKUDCF5732
Tartan Puppy / Small Dog Collar and Lead
SKU8613985ec49e