-
×
Harness Medium Blue
£8.00 -
×
-
×
Mountain Slip Lead Blue
£7.50 -
×
Black Lead 5/8" X 48"
£7.50 -
×
-
×
Purple Large 1" X 18-22"
£8.50 -
×
Red Medium 3/4" X 14-18"
£7.50 -
×
Extreme Rope Dog Toys
£12.00 -
×
-
×
-
×
60" Rope Slip Purple
£7.50 -
×
-
×
Zig Zags Puppy Blue
£4.25 -
×
Sports Harness Small Black
£14.00 -
×
-
×
-
×
Harness Medium Orange
£8.00 -
×
-
×
-
×
Red Lead 5/8" X 48"
£7.50 -
×
Harness Medium Black
£8.00 -
×
-
×
-
×
-
×
Sports Harness Large Black
£19.50 -
×
-
×
-
×
-
×
Harness X Small Orange
£7.00 -
×
-
×
-
×
-
×
4.0" (single) Large
£4.00 -
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm