-
×
Red Small
£12.00 -
×
-
×
-
×
Trigger Rope Lead Brown
£7.50 -
×
Harness 1" X 34" Large
£6.85 -
×
7.5cm Tpr Ball
£2.75 -
×
Harness X Small Blue
£7.00 -
×
Harness X- Small Black
£6.00 -
×
Lead 1" X 48" Large
£5.00 -
×
-
×
Zig Zags Puppy Blue
£4.25 -
×
Sports Harness Large Purple
£19.50 -
×
Lick Mats
£2.50 -
×
Plain Nylon Puppy Pink
£3.75 -
×
-
×
-
×
60" Rope Slip Black
£7.50 -
×
Sports Harness X Large Blue
£22.00 -
×
-
×
60" Rope Slip Grey
£7.50 -
×
-
×
-
×
1" Lead Large
£6.50 -
×
4.0" (single) Large
£4.00 -
×
-
×
-
×
60" Rope Slip Pink
£7.50 -
×
Rat Small
£4.50 -
×
Trigger Rope Lead Black
£7.50 -
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
Crazy Crocodile
£4.00 -
×
-
×
Purple Small
£11.00 -
×
1" X 18-22" Collar Large
£7.00 -
×
Dog Training Clicker
£2.00 -
×
-
×
-
×
Rabbit Country Dog Toy
£12.00
“Rabbit Country Dog Toy” has been added to your cart. View cart
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm