-
×
60" Rope Slip Purple
£7.50 -
×
-
×
-
×
-
×
Harness Medium Pink
£7.00 -
×
-
×
-
×
Harness Medium Black
£7.00 -
×
-
×
Sports Harness X Small Blue
£12.50 -
×
Sports Harness Bright Pink S
£15.00 -
×
-
×
Mountain Slip Lead Blue
£7.50 -
×
-
×
Harness Medium Orange
£8.00 -
×
Harness X Small Orange
£7.00 -
×
Trigger Rope Lead Brown
£7.50 -
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
60" Thin Rope Slip Pink
£6.75 -
×
60" Rope Slip Brown
£7.50 -
×
60" Thin Rope Slip Black
£6.75 -
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm
Bestsellers
Reflective Dots Puppy / Small Dog Collar and Lead
SKU7647966b7343