-
×
-
×
-
×
-
×
1" Collar Large
£4.50 -
×
Fish Cat Toy 18cm Mixed
£1.50 -
×
-
×
-
×
Sports Harness Medium Red
£17.50 -
×
-
×
Harness Medium Blue
£8.00 -
×
-
×
-
×
-
×
-
×
-
×
-
×
1" Lead Large
£6.50 -
×
-
×
7.5cm Tpr Ball
£2.75 -
×
Harness Medium Orange
£8.00 -
×
-
×
-
×
Sports Harness X Small Blue
£12.50 -
×
-
×
-
×
-
×
-
×
-
×
Sports Harness X Large Blue
£22.00 -
×
-
×
4.0" (single) Large
£4.00 -
×
-
×
Aqua Lead 5/8" X 48"
£7.00 -
×
60" Rope Slip Black
£7.50 -
×
-
×
-
×
-
×
1" X 18-22" Collar Large
£7.00 -
×
Bird Cat Toy 13cm Mixed
£1.50 -
×
-
×
-
×
-
×
“Roadkill Hare Country Dog Toy” has been added to your cart. View cart
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm