-
×
Country Animals
£3.50 -
×
-
×
-
×
-
×
-
×
-
×
Harness Medium Black
£7.00 -
×
-
×
-
×
Black Lead 5/8" X 48"
£7.50 -
×
Sports Harness Large Black
£19.50 -
×
-
×
-
×
-
×
Sports Harness Bright Pink L
£20.50 -
×
Snag Free Kitten Harness
£4.50 -
×
-
×
Fox Country Dog Toy
£11.00 -
×
-
×
-
×
-
×
Harness Medium Orange
£8.00 -
×
-
×
Harness X- Small Black
£6.00 -
×
-
×
Mountain Slip Lead Black
£7.50 -
×
Dog Training Clicker
£2.00 -
×
Crisps
£1.75 -
×
Pheasant Country Dog Toy
£12.00 -
×
Trigger Rope Lead Purple
£7.50 -
×
Trigger Rope Lead Black
£7.50 -
×
-
×
-
×
Pick Me Up Welsh Rugby Ball
£10.00 -
×
-
×
-
×
-
×
-
×
-
×
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm
Bestsellers
Reflective Dots Puppy / Small Dog Collar and Lead
SKU7647966b7343