-
×
-
×
-
×
-
×
-
×
Harness Medium Blue
£8.00 -
×
-
×
-
×
-
×
-
×
1" Collar Large
£4.50 -
×
-
×
-
×
Harness Medium Orange
£8.00 -
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
Fox Large
£5.50 -
×
Heart Beat Comforter Toy
£18.00 -
×
60" Rope Slip Black
£7.50 -
×
Mountain Slip Lead Black
£7.50 -
×
-
×
-
×
60" Thin Rope Slip Grey
£6.75 -
×
-
×
-
×
60" Rope Slip Grey
£7.50 -
×
-
×
Sports Harness X Small Red
£13.50 -
×
-
×
-
×
Harness 3/4" Medium
£6.30 -
×
Sports Harness Camo L
£20.50 -
×
Dog Training Clicker
£2.00 -
×
-
×
-
×
-
×
60" Thin Rope Slip Brown
£6.75
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm