-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
Heart Beat Comforter Toy
£18.00 -
×
-
×
Sports Harness Camo L
£20.50 -
×
-
×
-
×
-
×
-
×
Sports Harness Medium Red
£17.50 -
×
Harness X Small Purple
£7.00 -
×
-
×
-
×
Trigger Rope Lead Grey
£7.50 -
×
-
×
-
×
Harness Medium Red
£7.00 -
×
Sports Harness X Small Red
£13.50 -
×
-
×
-
×
-
×
-
×
Sports Harness Small Purple
£14.00 -
×
-
×
60" Thin Rope Slip Brown
£6.75 -
×
-
×
-
×
Harness Medium Purple
£8.00 -
×
Fox Large
£5.50 -
×
-
×
-
×
-
×
-
×
-
×
-
×
Sports Harness Bright Pink L
£20.50 -
×
-
×
60" Rope Slip Brown
£7.50 -
×
-
×
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm