-
×
Sports Harness Camo L
£20.50 -
×
Sports Harness Bright Pink L
£20.50 -
×
-
×
-
×
-
×
Wild Birds
£3.00 -
×
Sports Harness Camo S
£15.00 -
×
-
×
-
×
Harness X Small Orange
£7.00 -
×
Pick Me Up Welsh Rugby Ball
£10.00 -
×
-
×
-
×
-
×
-
×
-
×
Harness X- Small Aqua
£6.00 -
×
-
×
-
×
Sports Harness Medium Orange
£16.50 -
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
Lead 1" X 48" Large
£5.50 -
×
Sports Harness Large Purple
£19.50 -
×
Duck Country Dog Toy
£12.00 -
×
-
×
-
×
-
×
-
×
Mountain Slip Lead Blue
£7.50 -
×
Harness Medium Pink
£7.00 -
×
Trigger Rope Lead Black
£7.50
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm