-
×
Fox Country Dog Toy
£11.00 -
×
Duck Country Dog Toy
£12.00 -
×
-
×
Pheasant Country Dog Toy
£12.00 -
×
Tartan Dog Lead - Blue
£10.00 -
×
-
×
Rabbit Country Dog Toy
£12.00 -
×
Duck Brights Dog Toy
£9.00
Categories:Collars and Leads, Dogs, Training|Dog
Sports Training Long Lead – Reflective
0 Reviews
£21.00 – £27.00
Description
* Recall and Distance Control
* Durable and Strong
* Reflective for Safety
The Hem and Boo Sports range is made from tightly woven nylon; strong and durable with a sporty feel.
They are reflective for safety for those early morning and autumnal evening walks.
Ideal for mastering the recall technique and for practising distance control commands.
Coordinate the training long lead with the sports harness and collar.
3 Lengths
5M x 25mm
10M x 25mm
15M x 25mm
Bestsellers
Mountain Rope Trigger Leads
SKU735b90b45681