-
×
Harness 3/4" Medium
£6.30 -
×
-
×
-
×
-
×
Harness X- Small Red
£6.00 -
×
-
×
-
×
-
×
-
×
-
×
Harness X Small Orange
£7.00 -
×
-
×
-
×
Purple Small
£11.00 -
×
-
×
-
×
Black X- Large
£18.00 -
×
-
×
Sports Harness Large Purple
£19.50 -
×
-
×
Pick Me Up Welsh Rugby Ball
£10.00 -
×
Sports Harness Small Black
£14.00 -
×
Lead 3/4" X 48" Medium
£4.50 -
×
Sports Harness X Large Red
£23.50 -
×
Duck Large
£6.00 -
×
-
×
-
×
-
×
Harness Medium Orange
£8.00 -
×
-
×
-
×
-
×
Harness Medium Black
£7.00 -
×
-
×
-
×
Absorbent Solid Grey 10m X 75cm
£140.00 -
×
-
×
-
×
Black Large 1" X 18-22"
£9.00 -
×
-
×
Harness Medium Black
£8.00 -
×
-
×
-
×
60" Rope Slip Grey
£7.50 -
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm