-
×
Rugby Treat Ball
£2.50 -
×
-
×
Crisps
£1.75 -
×
-
×
-
×
Black X- Large
£18.00 -
×
-
×
-
×
-
×
60" Thin Rope Slip Grey
£6.75 -
×
-
×
-
×
Sports Harness X Large Red
£23.50 -
×
Sports Harness Medium Red
£17.50 -
×
-
×
-
×
1" Collar Large
£4.50 -
×
3/4" X 48 Lead Medium
£6.00 -
×
Lead 1" X 48" Large
£5.00 -
×
Purple Large 1" X 18-22"
£8.50 -
×
-
×
1" X 18-22" Collar Large
£7.00 -
×
-
×
-
×
-
×
-
×
60" Rope Slip Purple
£7.50 -
×
-
×
Sports Harness X Small Red
£13.50 -
×
Red Lead 5/8" X 48"
£7.50 -
×
Harness 1/2" Small
£5.25 -
×
Harness X- Small Pink
£6.00 -
×
Tartan Puppy Pink
£4.25 -
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
-
×
Harness 1" X 34" Large
£6.85 -
×
60" Thin Rope Slip Pink
£6.75
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm