-
×
-
×
-
×
Mountain Slip Lead Blue
£7.50 -
×
Sports Harness Bright Pink S
£15.00 -
×
-
×
-
×
-
×
2.5" (pack Of 2)
£2.10 -
×
-
×
-
×
Harness Medium Black
£7.00 -
×
-
×
-
×
-
×
60" Rope Slip Black
£7.50 -
×
-
×
Lead 1" X 48" Large
£5.50 -
×
1" X 18-22" Collar Large
£7.00 -
×
85cm 4 Knot Heavy Rope
£6.50 -
×
3/4" X 48 Lead Medium
£6.00 -
×
-
×
-
×
Red Medium 3/4" X 14-18"
£7.50 -
×
Harness 3/4" Medium
£6.30 -
×
Feather Wand 57cm
£2.00 -
×
3/4" X 48 Lead Medium
£6.00 -
×
-
×
-
×
-
×
Red Large
£16.00 -
×
-
×
-
×
Purple Large 1" X 18-22"
£8.50
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm
Bestsellers
Categories: Collars and Leads|Dog, Dogs, Flashing Range|Dog, Nylon/Rope/Tougher Toys|Dog, Toys, Toys
Flashing Pet Collar
£10.00SKUDCF5732
Tartan Puppy / Small Dog Collar and Lead
SKU8613985ec49e