-
×
-
×
2.5" (pack Of 2)
£2.10 -
×
-
×
Sports Harness Camo L
£20.50 -
×
Harness X- Small Red
£6.00 -
×
3/4" Collar Medium
£4.00 -
×
-
×
-
×
4.0" (single) Large
£4.00 -
×
Harness X Small Orange
£7.00 -
×
-
×
-
×
3/4" Lead Medium
£5.50 -
×
Lead 1" X 48" Large
£5.00 -
×
Purple Lead 1" X 48"
£8.50 -
×
-
×
-
×
-
×
Harness X- Small Black
£6.00 -
×
-
×
-
×
7.5cm Tpr Ball
£2.75 -
×
-
×
-
×
-
×
60" Thin Rope Slip Grey
£6.75 -
×
-
×
-
×
-
×
Red Large
£16.00 -
×
3/4" Collar Medium
£4.00
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm