-
×
60" Rope Slip Brown
£7.50 -
×
Harness Medium Black
£7.00 -
×
-
×
-
×
60" Rope Slip Purple
£7.50 -
×
-
×
-
×
-
×
Sports Harness X Large Blue
£22.00 -
×
Harness Medium Blue
£8.00 -
×
Harness X Small Orange
£7.00 -
×
-
×
-
×
-
×
60" Thin Rope Slip Pink
£6.75 -
×
Sports Harness Large Purple
£19.50 -
×
Squirrel Country Dog Toy
£12.00 -
×
Harness X- Small Pink
£6.00 -
×
60" Thin Rope Slip Grey
£6.75 -
×
Tartan Dog Lead - Blue
£10.00 -
×
-
×
-
×
Pheasant Country Dog Toy
£12.00 -
×
Mountain Slip Lead Blue
£7.50 -
×
-
×
Flashing Pet Collar
£10.00 -
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm
Bestsellers
Plain Nylon Puppy / Small Dog Collar and Lead
SKU54229abfcfa5