-
×
-
×
-
×
-
×
-
×
-
×
Rock With Dinosaurs
£5.00 -
×
Trigger Rope Lead Grey
£7.50 -
×
-
×
Harness 3/4" Medium
£6.30 -
×
5cm Tpr Ball
£2.25 -
×
-
×
60" Thin Rope Slip Black
£6.75 -
×
-
×
-
×
Lead 1" X 48" Large
£5.50 -
×
-
×
Lead 3/4" X 48" Medium
£4.50 -
×
4.0" (single) Large
£4.00 -
×
-
×
Sports Harness Large Black
£19.50 -
×
-
×
-
×
Sports Harness Small Black
£14.00 -
×
-
×
Feather Wand 57cm
£2.00 -
×
-
×
Harness X- Small Aqua
£6.00 -
×
Trigger Rope Lead Purple
£7.50 -
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm