-
×
Red Lead 5/8" X 48"
£7.50 -
×
-
×
Lead 3/4" X 48" Medium
£4.50 -
×
-
×
-
×
Harness X- Small Pink
£6.00 -
×
Trigger Rope Lead Purple
£7.50 -
×
-
×
-
×
Red Large
£16.00 -
×
Tartan Puppy Pink
£4.25 -
×
-
×
-
×
Harness Medium Orange
£8.00 -
×
-
×
-
×
-
×
Crazy Crocodile
£4.00 -
×
-
×
-
×
60" Rope Slip Pink
£7.50 -
×
-
×
Harness X- Small Purple
£6.00 -
×
-
×
Harness X Small Orange
£7.00 -
×
-
×
60" Thin Rope Slip Brown
£6.75 -
×
Harness 3/4" Medium
£6.30 -
×
-
×
-
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm
Bestsellers
Reflective Dots Puppy / Small Dog Collar and Lead
SKU7647966b7343