-
×
-
×
-
×
-
×
-
×
Harness X Small Orange
£7.00 -
×
-
×
-
×
-
×
60" Rope Slip Pink
£7.50 -
×
Rock With Dinosaurs
£5.00 -
×
-
×
-
×
Harness X Small Blue
£7.00 -
×
-
×
Aqua X-large
£16.50 -
×
-
×
-
×
Harness X Small Purple
£7.00 -
×
-
×
1" Collar Large
£4.50 -
×
3/4" Lead Medium
£5.50 -
×
Lead 1" X 48" Large
£5.00 -
×
-
×
-
×
Absorbent Solid Grey 10m X 75cm
£140.00 -
×
-
×
-
×
-
×
-
×
-
×
60" Thin Rope Slip Pink
£6.75 -
×
Pick Me Up Welsh Rugby Ball
£10.00 -
×
Trigger Rope Lead Brown
£7.50 -
×
Country Animals
£3.50 -
×
-
×
-
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm