-
×
-
×
-
×
Absorbent Solid Grey 10m X 75cm
£140.00 -
×
-
×
Sports Harness Medium Orange
£16.50 -
×
Harness Medium Pink
£7.00 -
×
-
×
Cord Mats Mixed Colour
£10.00 -
×
-
×
-
×
-
×
-
×
-
×
-
×
3/4" Collar Medium
£4.00 -
×
-
×
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm
Bestsellers
Mountain Rope Trigger Leads
SKU735b90b45681