-
×
Sports Harness X Small Red
£13.50 -
×
-
×
-
×
Harness 1/2" Small
£5.25 -
×
Aqua Lead 5/8" X 48"
£7.00 -
×
Sports Harness Small Purple
£14.00 -
×
3/4" X 48 Lead Medium
£6.00 -
×
-
×
Trigger Rope Lead Grey
£7.50 -
×
-
×
-
×
Pick Me Up Rugby Ball Mixed
£10.00 -
×
Sports Harness X Large Red
£23.50 -
×
Plain Nylon Puppy Red
£3.75 -
×
-
×
Harness Medium Pink
£7.00 -
×
-
×
-
×
Harness X- Small Aqua
£6.00 -
×
-
×
-
×
-
×
Sports Harness Bright Pink S
£15.00 -
×
-
×
-
×
Black Medium
£14.00 -
×
-
×
-
×
2.5" (pack Of 2)
£2.10 -
×
Crazy Crocodile
£4.00 -
×
Hare Roadkill Small
£5.50 -
×
-
×
Rock With Dinosaurs
£5.00 -
×
Sports Harness Large Black
£19.50 -
×
1" Lead Large
£6.50 -
×
-
×
-
×
-
×
-
×
Black X- Large
£18.00 -
×
-
×
Harness X Small Purple
£7.00 -
×
60" Rope Slip Black
£7.50
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Training Long Lead
0 Reviews
£21.00 – £26.00
Description
* Recall and Distance Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo training long leads are made from
tightly woven nylon with interwoven rubber for extra
grip and control.
Ideal for mastering the recall technique and for
practising distance control commands.
Coordinate the training long lead with the
Sports harness and Sports collar.
2 Lengths
3M x 15mm
5M x 15mm