-
×
-
×
Sports Harness Small Orange
£14.00 -
×
60" Rope Slip Black
£7.50 -
×
-
×
-
×
-
×
-
×
-
×
60" Thin Rope Slip Grey
£6.75 -
×
Sports Harness Medium Red
£17.50 -
×
Absorbent Solid Grey 10m X 75cm
£140.00 -
×
Sports Harness X Small Red
£13.50 -
×
SUPER Mega Ball
£9.00
Categories:Collars and Leads, Dogs, Training|Dog
Non Slip Double Handle Long Lead
0 Reviews
£17.00
Description
* Double Handle for Extra Control
* Durable and Strong
* Rubber Grip for All Weathers
The Hem and Boo tdouble handle long lead is made from tightly woven nylon with interwoven rubber for extra grip and control.
A longer length lead to give your dog more freedom to explore and use their senses.
1.8M x 15mm
Bestsellers
Categories: Collars and Leads|Dog, Dogs, Flashing Range|Dog, Nylon/Rope/Tougher Toys|Dog, Toys, Toys
Flashing Pet Collar
£10.00SKUDCF5732
Tartan Puppy / Small Dog Collar and Lead
SKU8613985ec49e